WISE Portfolio — FY26

Carbon credit portfolio · Latest data

Include Equilibrium*

Total spend

£860k

6 projects

Total credits

37,033

tCO₂e

Avg price / credit

£23

blended

Tranche split

£398k / £462k

T1 / T2

Spend by project

Ecoforest 1Alcom 1CarboneersNetZeroFCFCultivo

Credits volume by project

Ecoforest 1Alcom 1CarboneersNetZeroFCFCultivo

Spend by project type

IFMIndustrial BiocharArtisanal BiocharARR

Spend by country

MexicoPhilippinesIndiaBrazil

Credits by country

MexicoPhilippinesIndiaBrazil

Budget vs actuals

BudgetSpentRemaining
* Equilibrium excluded from default view — toggle to include. FCF represents three consolidated transactions (FCF1, FCF2, FCF3). Total budget: £900,000.

About Opna

Opna is the market infrastructure for critical power equipment: transformers, switchgear, HV cables, generators. Buyers get verification, speed, transferable slots they can hold before specs are finalised, and CapEx aligned to their draw schedule. Manufacturers get order book certainty they can build new capacity against.

© 2026 Salt Global Tech Limited (trading as Opna). All rights reserved.

About Opna

Opna is the market infrastructure for critical power equipment: transformers, switchgear, HV cables, generators. Buyers get verification, speed, transferable slots they can hold before specs are finalised, and CapEx aligned to their draw schedule. Manufacturers get order book certainty they can build new capacity against.

© 2026 Salt Global Tech Limited (trading as Opna). All rights reserved.

About Opna

Opna is the market infrastructure for critical power equipment: transformers, switchgear, HV cables, generators. Buyers get verification, speed, transferable slots they can hold before specs are finalised, and CapEx aligned to their draw schedule. Manufacturers get order book certainty they can build new capacity

© 2026 Salt Global Tech Limited (trading as Opna). All rights reserved.

About Opna

Opna is the market infrastructure for critical power equipment: transformers, switchgear, HV cables, generators. Buyers get verification, speed, transferable slots they can hold before specs are finalised, and CapEx aligned to their draw schedule. Manufacturers get order book certainty they can build new capacity against.

© 2026 Salt Global Tech Limited (trading as Opna). All rights reserved.