Get to power faster

Your power equipment lead time is your biggest delivery risk. We fix that.

Your power equipment lead time is your biggest delivery risk. We fix that.

Verified transformers, switchgear, and the wider BOM, payments that move with your project, and a place in the queue before you have to commit to a spec.

What Opna does

What Opna does

Start before you are ready to order. We hold the slot until you are.

Most developers run into one of two problems: portfolio flexibility gets expensive if a timeline slips and equipment is already committed, or a fixed energisation date is at risk because equipment is the binding constraint.

1.

Reserve your slot

We reserve your slot early, across a panel of OEMs, before your specs are frozen or your sites are sequenced.

2.

Site is ready

When a site is ready, you are already in the queue.

3.

Place final order

You convert the slot to a firm order with the right spec at the right time, not months earlier when you are still guessing.

The results

The results

On time, no stranded cost, no early commitment.

Faster energisation

No stranded equipment cost

No balance sheet commitment before you need it

Share your spec, no commitment required

Accelerate your energisation.

One site or a full portfolio - we will give you a clear view of what is available, what it costs, and what your programmes can realistically support.

© 2026 Salt Global UK Limited. All rights reserved.

© 2026 Salt Global UK Limited. All rights reserved.

© 2026 Salt Global UK Limited. All rights reserved.

© 2026 Salt Global UK Limited. All rights reserved.