What we're writing & being asked about

News & insights.

News & insights.

opna breakfast women

September 2026

Opna’s response to Ofgem’s Curate consultation.

Curate is a new system designed to improve demand management specifically for data centres. It evaluates whether developers are serious and capable of delivering their projects, and it can weed out those who aren’t up to the task.

opna breakfast women

August 2026

How can a European data centre operator accelerate their energisation?

Order long-lead equipment earlier, and make that order evidence of two things. Under Ofgem's July 2026 proposals, proof that you have procured transformers and switchgear becomes a condition of holding your grid connection position. Equipment procurement is no longer only a schedule lever. It becomes a queue lever.

opna breakfast women

July 2026

A practical guide: How a UK data centre connects to the grid.

Everyone in this industry should know how to build a data centre. Far fewer can tell you how to power one because connecting a site to the grid is a different discipline, with its own rulebook and timeline.

Opna - World Economic Forum Technology Pioneer logo

June 2026

Opna named as AI & Energy Technology Pioneer by World Economic Forum.

Each year, the World Economic Forum recognises 100 organisations for their cutting-edge technologies with the potential to improve the world. The 2026 cohort highlights the major trends in global innovation, including AI infrastructure and robotics.

opna electricity pillar

May 2026

Grid reform: A dummies guide to the latest EU and GB grid policies.

If you work in energy, renewables, data centres or anything that needs a grid connection, you'll have heard a lot of noise about grid reform over the past year or two. The grid reform can't wait.

opna electricity pillar

April 2026

Wiring the transition: There is no decarbonisation without electrification.

Europe's net-zero targets depend on electrifying virtually every sector, driving a massive and sustained increase in electricity demand. The binding constraint is no longer renewable technology or cost — it is the physical grid infrastructure, especially transformers, transmission lines, and substations, where lead times and connection queues stretch years into the future.

opna breakfast women

March 2026

Opna hosts Key Leaders Event with women in energy x infrastructure x aI

Opna hosted their first Women Leaders breakfast for those working at the intersection of energy, infrastructure and AI to discuss the megawatt trilemma and how we can't have all three unless we lead differently.

opna breakfast women

March 2026

Opna responds to Ofgem's call for input on demand connections reform.

Opna argues that the connections queue can't be fixed without fixing the power equipment supply chain that sits beneath it. And calls for supply chain commitment to be a formal milestone in Ofgem's reform framework and makes the case that AI infrastructure and decarbonisation are complementary.

Opna - UK Houses of Parliament at night

March 2026

Opna responds to DESNZ consultation on accelerating electricity network connections for strategic demand.

Opna argues a priority queue position means nothing without the supply chain access to energise on time — and that supply chain readiness must be built into the government's strategic designation criteria.

Opna - UK Houses of Parliament at night

February 2026

Critical power equipment: The current plug to decarbonising Europe.

Grid connections, not generation, are the bottleneck in Europe’s clean energy rollout. A shortage of key equipment, especially large transformers, has created long lead times and rising costs. Fixing the problem requires coordinated grid reform and supply-chain planning.

Opna - UK Houses of Parliament at night

December 2025

Whitepaper: AI infrastructure as climate infrastructure.

Explore how as an industry we can leverage the AI inferencing surge to anchor equitable financing for the real economy and communities - funding renewables, low-carbon materials, carbon removal, and water restoration.

Opna - UK Houses of Parliament at night

December 2025

AI infrastructure: Hyperscale growth and its limits.

Concentrated facilities strain local grids, water systems, and communities, underscoring the need for a more balanced, climate-aligned approach. The future is distributed intelligence: Smaller, modular, and distributed data centres can turn AI infrastructure into a foundation for resilience and the net-zero transition.

About Opna

Opna is the market infrastructure for critical power equipment: transformers, switchgear, HV cables, generators. Buyers get verification, speed, transferable slots they can hold before specs are finalised, and CapEx aligned to their draw schedule. Manufacturers get order book certainty they can build new capacity against.

© 2026 Salt Global Tech Limited (trading as Opna). All rights reserved.

About Opna

Opna is the market infrastructure for critical power equipment: transformers, switchgear, HV cables, generators. Buyers get verification, speed, transferable slots they can hold before specs are finalised, and CapEx aligned to their draw schedule. Manufacturers get order book certainty they can build new capacity against.

© 2026 Salt Global Tech Limited (trading as Opna). All rights reserved.

About Opna

Opna is the market infrastructure for critical power equipment: transformers, switchgear, HV cables, generators. Buyers get verification, speed, transferable slots they can hold before specs are finalised, and CapEx aligned to their draw schedule. Manufacturers get order book certainty they can build new capacity against.

© 2026 Salt Global Tech Limited (trading as Opna). All rights reserved.

About Opna

Opna is the market infrastructure for critical power equipment: transformers, switchgear, HV cables, generators. Buyers get verification, speed, transferable slots they can hold before specs are finalised, and CapEx aligned to their draw schedule. Manufacturers get order book certainty they can build new capacity

© 2026 Salt Global Tech Limited (trading as Opna). All rights reserved.